Upgrading of 9.3Km to asphalt concrete standard, construction of community facilities (market) culverts, drainage works, road marking, pedestrian pathway, and
Periodic maintenance of Dia/Ukonga JCT – Chanika road section
-
date: 01 Jan 2021
-
client: REGIONAL MANAGER’S OFFICE, TANROADS - DAR ES SALAAM P. O. BOX 4838, DAR ES SALAAM
-
-
location: DAR ES SALAAM
Periodic maintenance of Dia/Ukonga JCT – Chanika road section
Installation of pipe culverts and service ducts, Cut and spoil including road bed, Removal of existing structures, pavement layers, Fill of G15 layer, Stabilized layer, material class C1, Base course layer crushed aggregates class CRR, Prime coat (MC-30), Asphalt concrete surfacing AC 20, Concrete works, General Ancillary works
Related Projects
Installation of pipe culverts and service ducts, Cut and spoil including road bed, Removal of existing structures, pavement layers, Fill
Gravelling within FHD, Rock Fill(boulders), Synthetic-fibre filter fabric 210 g/sq.m (Geo-Textile), Heavy grading, 200mm thick natural granular material layer of