Preparation of potholes for patching, cement stabilized layer for base course. Application of prime coat followed by 1st and 2nd
Construction of Bukoba municipal roads (5.0Km) to bitumen standard (surface Dressing)
-
date: 01 Jan 2021
-
client: Municipal Director, BUKOBA MUNICIPAL COUNCIL, P. O. BOX 284, BUKOBA.
-
-
location: BUKOBA
Construction of Bukoba municipal roads (5.0Km) to bitumen standard (surface Dressing)
Upgrading of 5.02km to asphalt standard, culverts, drainage works, road marking, and installation of standard road signs.
Related Projects
Installation of pipe culverts and service ducts, Cut and spoil including road bed, Removal of existing structures, pavement layers, Fill
Gravelling within FHD, Rock Fill(boulders), Synthetic-fibre filter fabric 210 g/sq.m (Geo-Textile), Heavy grading, 200mm thick natural granular material layer of