Preparation of potholes for patching, cement stabilized layer for base course. Application of prime coat followed by 1st and 2nd
Upgrading of Ardhi – Makongo – Goba road to bitumen standard, phase ii: Ardhi – Makongo section 4.5KM:
-
date: 01 Jan 2021
-
client: Ion Sturza
-
-
value: 50,000
-
location: chandigarh
Upgrading of Ardhi – Makongo – Goba road to bitumen standard, phase ii: Ardhi – Makongo section 4.5KM:
Upgrading of 4.5Km to asphalt concrete standard including culverts, drainage works, road marking, and installation of standard road signs.
Related Projects
Gravelling within FHD, Rock Fill(boulders), Synthetic-fibre filter fabric 210 g/sq.m (Geo-Textile), Heavy grading, 200mm thick natural granular material layer of
Installation of pipe culverts and service ducts, Cut and spoil including road bed, Removal of existing structures, pavement layers, Fill
