Excavating, hauling to tailings 20Km of 114,000m3 of gold ore materials to a processing plant.
-
date: 01 Jan 2021
-
client: REIONAL MANAGER OFFICE, TANROADS MWANZA, P. O. BOX 1410, MWANZA
-
location: MWANZA
Emergency works along Nyamazugo – Bukokwa road (Nyamazogo section)
Gravelling within FHD, Rock Fill(boulders), Synthetic-fibre filter fabric 210 g/sq.m (Geo-Textile), Heavy grading, 200mm thick natural granular material layer of quality equal to G45 or above, 200mm thick 0-6mm crusher run stone dust layer. Precast reinforced concrete box culverts cells as per the drawing. Under water Gabion cages with boulders of regular shape including binding strings. Under water Reno matrices with boulder of regular shape including binding strings.