Emergency works along Nyamazugo – Bukokwa road (Nyamazogo section)
Gravelling within FHD, Rock Fill(boulders), Synthetic-fibre filter fabric 210 g/sq.m (Geo-Textile), Heavy grading, 200mm thick natural granular material layer of quality equal to G45 or
Periodic maintenance on Nyamuhama – Bwanga – Ibanda paved road.
Preparation of potholes for patching, cement stabilized layer for base course. Application of prime coat followed by 1st and 2nd seal layers. Resealing of 10Km
Preventive maintenance of Ukonga Junction – Chanika, Banana – Tabata Junction, jet corner – Davis corner and Spot improvement of Chanika – Mbande – Mbagala rangi tatu and Malambamawili – Kinyerezi.
Installation of pipe culverts and service ducts, Cut and spoil including road bed, Removal of existing structures, pavement layers, Fill of G15 layer, Stabilized layer,
Upgrading of Ardhi – Makongo – Goba road to bitumen standard, phase ii: Ardhi – Makongo section 4.5KM:
Upgrading of 4.5Km to asphalt concrete standard including culverts, drainage works, road marking, and installation of standard road signs.
Periodic maintenance of Dia/Ukonga JCT – Chanika road section
Installation of pipe culverts and service ducts, Cut and spoil including road bed, Removal of existing structures, pavement layers, Fill of G15 layer, Stabilized layer,
Construction of investment sub-project in Mbagala ward (Bughudadi & Kizinga sub Wards) in Temeke municipality. Package 10.
Upgrading of 9.3Km to asphalt concrete standard, construction of community facilities (market) culverts, drainage works, road marking, pedestrian pathway, and installation of street lights and
Construction of Bukoba municipal roads (5.0Km) to bitumen standard (surface Dressing)
Upgrading of 5.02km to asphalt standard, culverts, drainage works, road marking, and installation of standard road signs.
Sub-contract for earthworks at Msalala Gold Mine
Excavating, hauling to tailings 20Km of 114,000m3 of gold ore materials to a processing plant.